Adaptive Current Modulation

More AI output. Less power.

Up to 21%

Less GPU die power, measured

Up to 27%

More accelerators fit the same envelope, derived

Workload swings strand power in AI factories. ADAPT reads each GPU's power signal and sets its operating point in real time, so the same work draws less, inside the power you already hold. The 21% is measured at the GPU die over 48 hours on NVIDIA H100 NVL, and the 27% is derived from it.

Calculate your headroom
NVIDIA H100 NVL48 hour window
Draw profile, one shiftShaded band, released capacity
Dashed, baselineSolid, modulated

Up to 21%

Less GPU die power, measured

Sustained across a continuous 48 hour window.

0%

Throughput change in the run, derived

Every service level intact, on up to 21% less GPU die power.

Up to +22%

Tokens per watt, derived, balanced mode

The same tokens on less energy.

118 days

Of testing

Across six accelerator architectures.

Signed per GPU energy records, hash linked and auditable by a third party, across 118 days of testing on six accelerator architectures.

The method

Sense, predict, determine, control.

Four steps, run continuously on the rail, on hardware you already own.

  1. 110

    Sense

    Read the rail as a signal rather than as an average.

  2. 120

    Predict

    Anticipate the next demand from the shape already present.

  3. 130

    Determine

    Choose the correction that holds the envelope.

  4. 140

    Control

    Apply it, then measure the result and repeat.

Who this is for

If you own the power budget, the capacity plan or the silicon roadmap, there is a path here for you.

Six seats at the same table. Pick the one that matches your role and read the outcome in your own units.

Why now

You cannot build your way out. You can stop wasting what you already have.

Power, not chips, is the ceiling on AI data centres. It can take up to seven years to connect new capacity in Europe, and in North America electrical equipment lead times run 18 to 54 weeks by category. Meanwhile every GPU you own holds power it never uses, because the ceiling was sized for the worst case.

You are already paying for every megawatt. ADAPT turns the wasted part of each megawatt into sellable compute.

  • A new grid connection

    Time
    Up to seven years, Europe
    Capital
    Grid and civil works
    What you get
    More megawatts, eventually
  • New electrical equipment

    Time
    18 to 54 weeks by category, North America
    Capital
    Capital project
    What you get
    More megawatts, eventually
  • More accelerators

    Time
    Lead time plus install
    Capital
    Hardware capital
    What you get
    Helps once power is freed inside the envelope
  • ADAPT, one software install

    Time
    Hours
    Capital
    None
    What you get
    Capacity released from hardware already racked

Stated, cited. Grid connection: Amazon Web Services, reported by Reuters, 3 February 2026. Electrical equipment lead times: McKinsey and Company, March 2026.

The breakthrough

Everything else in the rack reads a number. ADAPT reads a pattern.

Adaptive Current Modulation reads, predicts and reshapes a power signal in the frequency domain. Conventional control measures an average and corrects after the event. ADAPT recognises the workload's signature and gives it exactly the power it needs, before the excursion arrives.

22Orders of magnitudeThe span of the method's mathematics, from sub millihertz fleet drift to above petahertz fabrication.
14DomainsCompute is the beachhead.
210ApplicationsDocumented applications of one method, counted 19 August 2026.

Compute is measured today, on NVIDIA H100 NVL. Every other domain is designed on the same method, with its depth shared with licensees under agreement.

The products

Three licensing vehicles, one method.

All products

The instrument

Set your envelope. Read your released capacity.

Building new power is capital you spend once and then wait for. Power the runtime frees works for you every year, one of two ways: electricity you stop buying, or capacity you keep inside the envelope you already hold. Put in your own fleet, site power and prices, and read both.

Your site IT power10MW

+2.1MW released

At the reduction measured in testing. Measured on production NVIDIA H100 NVL under an equal power cap on managed and baseline arms. Your fleet baseline confirms the figure for your site.

Up to +22%Tokens per watt, derived, balanced mode
0%Throughput change in the run, derived

The complete system

One controlled signal, from silicon to the grid.

Move through the power path and see where Intelligent Power Management Module, AI-Driven Adaptive Power Technology and ATHLAZ Power Network act.

Six line drawings step outward along the power path: a processor package with the rail into its die, one rack of eight compute units on a power spine, a data hall from above with power reaching every rack, a substation and transmission lines feeding several facilities, a wireframe globe of linked sites, and an orbital platform with solar arrays above the Earth. Each drawing marks the power path in green, and the panel beside it names the ATHLAZ product acting at that scale: iPMM at the chip, ADAPT at the rack and the facility, and the ATHLAZ Power Network from the grid outward.

Scale 1 of 6

Control begins at the die.

Intelligent Power Management Module brings programmable power into the silicon power path and the rail that feeds it.

iPMM at this scale
10 MW

+2.1 MW

Released

+26

80 kW racks

Guides

Data centre power, in plain words.

Six guides that answer the question first, then say where ATHLAZ fits.

Company

We are giving energy a brain.

Solving the energy of today funds the breakthroughs of tomorrow, because energy is the constraint sitting underneath every other constraint worth removing.